VESSEL MONTHLY REPORT
VESSEL NAME:
LPG/C SURVILLE
REPORT NO:
1
REPORT DATE:
3/5/2025
VOYAGE TIMELINE
| Loading: | RAS TANURA, SAUDI ARABIA |
| Discharging: | KANDLA & MUMBAI, INDIA |
| Cargo: | BUTANE - PROPANE |
| Loading: | RUWAIS, UAE |
| Discharging: | KANDLA & MUMBAI, INDIA |
| Cargo: | BUTANE - PROPANE |
| Loading: | RUWAIS, UAE |
| Discharging: | KANDLA & MUMBAI, INDIA |
| Cargo: | ON GOING - MARCH |
CHARTER DETAILS
Charterer:
GEOGAS TRADING S.A.
Charter Type:
TIME CHARTER
Charter Party Date:
8-Aug-24
Charter Duration (months):
36 MONTHS PLUS OR MINUS 15 DAYS IN CHRTS OPTION
Delivery Date:
12-Dec-24
Rate (USD PCM):
$860,000.00
Commission:
1.25%
VETTING STATUS AND THIRD-PARTY INSPECTIONS
SIRE LAST - DUE DATE
LOCATION
EXTRA DETAILS
10/9/2024 - 4/9/2025
ZANZIBAR, TANZANIA
MAXCOM
FLAG INSPECTION DATE
LOCATION
10/28/2024
MUMBAI, INDIA
PORT STATE CONTROL DATE
LOCATION
9/6/2024
OWENDO, GABON
LAST CDI DATE
LOCATION
11/2/2017
ABIDJAN, IVORY COAST
TECHNICAL AND OPERATIONAL ISSUES
Item: Inmarsat C1 Transmission.
Date: 03-02-2025.
Status: Pending.
Description: Inmarsat C1 sudden failure with an error appearing for "Antenna communication lost". Vessel identified the possible root cause to be the cable/connectors malfunction by checking the supply voltage, cable continuity, and by swapping the antenna from the Inmarsat C2. Technical arrange an authorized service engineer to attend during the vessels next call at Antwerp on the 8th of February along with the necessary spare parts.
Item: Diesel Generator No.2 Main Air Circuit Brake
Date: 2/1/2025
Status: COMPLETED
Description: Replacement of the Air Circuit Breaker on the Diesel Generator No.2 during vessel’s call at Singaporean Anchorage. The replacement and testing conducted successfully by attending superintendent Electrician. The Diesel Generator was tested with satisfactory results underway.
MAJOR MAINTENANCE ITEMS
Item: BWTS EDUCTOR
Date: 1/20/2025
Status: COMPLETED
Description: The stripping operation by eductor through the BWTS was successfully completed after the eductor troubleshooting.
Item: τεστ
Date: 12/1/2025
Status: ον going
Description: αδσαδαδαδασδασδ
Item: BWTS EDUCTOR
Date: 1/20/2025
Status: COMPLETED
Description: The stripping operation by eductor through the BWTS was successfully completed after the eductor troubleshooting.
MONTHLY DECK MAINTENANCE REPORT
Description: COMPRESSOR FAN METAL GUARDS MAINTENANCE
Status: COMPLETED
Description: FORECASTLE VENTILATION PIPE MAINTENANCE
Status: COMPLETED
Description: FWD BITTS, ROLLERS AND FAIRLEADS MAINTENANCE
Status: COMPLETED
Description: LADDERS MAINTENANCE
Status: COMPLETED
Description: MAIN DECK BITTS, ROLLERS AND FAIRLEADS MAINTENANCE
Status: IN PROGRESS
Description: GEFURAKI
Status: IN PROGRESS
Description: ACC WINDOWS - COSMETIC IMPROVEMENT
Status: IN PROGRESS
Description: CRANE COSMETIC IMPROVEMENT
Status: IN PROGRESS
Description: ETA ARRANGEMENTS
Status: IN PROGRESS
Description: DECK HOUSE FAN
Status: COMPLETED
Description: UPPER DECK MAINTENANCE
Status: IN PROGRESS
Description: FWD MOORING STATION IMPROVEMENT
Status: IN PROGRESS
Description: AFT BITTS ROLLERS FAIRLEADS MAINTENANCE
Status: IN PROGRESS
Description: VARIOUS FANS AND EXAUST FANS COSMETIC IMPROVEMENT
Status: COMPLETED
Description: VARIOUS ACC ENTRANCE - VENTS COSMETIC
Status: IN PROGRESS