VESSEL MONTHLY REPORT

VESSEL NAME:

LPG/C SURVILLE

REPORT NO:

1

REPORT DATE:

3/5/2025

VOYAGE TIMELINE

01 - 06
Loading: RAS TANURA, SAUDI ARABIA
Discharging: KANDLA & MUMBAI, INDIA
Cargo: BUTANE - PROPANE
01 - 07
Loading: RUWAIS, UAE
Discharging: KANDLA & MUMBAI, INDIA
Cargo: BUTANE - PROPANE
01 - 08
Loading: RUWAIS, UAE
Discharging: KANDLA & MUMBAI, INDIA
Cargo: ON GOING - MARCH

CHARTER DETAILS

Charterer:

GEOGAS TRADING S.A.

Charter Type:

TIME CHARTER

Charter Party Date:

8-Aug-24

Charter Duration (months):

36 MONTHS PLUS OR MINUS 15 DAYS IN CHRTS OPTION

Delivery Date:

12-Dec-24

Rate (USD PCM):

$860,000.00

Commission:

1.25%

VETTING STATUS AND THIRD-PARTY INSPECTIONS

SIRE LAST - DUE DATE

LOCATION

EXTRA DETAILS

10/9/2024 - 4/9/2025

ZANZIBAR, TANZANIA

MAXCOM

FLAG INSPECTION DATE

LOCATION

10/28/2024

MUMBAI, INDIA

PORT STATE CONTROL DATE

LOCATION

9/6/2024

OWENDO, GABON

LAST CDI DATE

LOCATION

11/2/2017

ABIDJAN, IVORY COAST

TECHNICAL AND OPERATIONAL ISSUES

Item: Inmarsat C1 Transmission.

Date: 03-02-2025.

Status: Pending.

Description: Inmarsat C1 sudden failure with an error appearing for "Antenna communication lost". Vessel identified the possible root cause to be the cable/connectors malfunction by checking the supply voltage, cable continuity, and by swapping the antenna from the Inmarsat C2. Technical arrange an authorized service engineer to attend during the vessels next call at Antwerp on the 8th of February along with the necessary spare parts.

Item: Diesel Generator No.2 Main Air Circuit Brake

Date: 2/1/2025

Status: COMPLETED

Description: Replacement of the Air Circuit Breaker on the Diesel Generator No.2 during vessel’s call at Singaporean Anchorage. The replacement and testing conducted successfully by attending superintendent Electrician. The Diesel Generator was tested with satisfactory results underway.

MAJOR MAINTENANCE ITEMS

Item: BWTS EDUCTOR

Date: 1/20/2025

Status: COMPLETED

Description: The stripping operation by eductor through the BWTS was successfully completed after the eductor troubleshooting.

Item: τεστ

Date: 12/1/2025

Status: ον going

Description: αδσαδαδαδασδασδ

Item: BWTS EDUCTOR

Date: 1/20/2025

Status: COMPLETED

Description: The stripping operation by eductor through the BWTS was successfully completed after the eductor troubleshooting.

MONTHLY DECK MAINTENANCE REPORT

Description: COMPRESSOR FAN METAL GUARDS MAINTENANCE

Status: COMPLETED

Description: FORECASTLE VENTILATION PIPE MAINTENANCE

Status: COMPLETED

Description: FWD BITTS, ROLLERS AND FAIRLEADS MAINTENANCE

Status: COMPLETED

Description: LADDERS MAINTENANCE

Status: COMPLETED

Description: MAIN DECK BITTS, ROLLERS AND FAIRLEADS MAINTENANCE

Status: IN PROGRESS

Description: GEFURAKI

Status: IN PROGRESS

Description: ACC WINDOWS - COSMETIC IMPROVEMENT

Status: IN PROGRESS

Description: CRANE COSMETIC IMPROVEMENT

Status: IN PROGRESS

Description: ETA ARRANGEMENTS

Status: IN PROGRESS

Description: DECK HOUSE FAN

Status: COMPLETED

Description: UPPER DECK MAINTENANCE

Status: IN PROGRESS

Description: FWD MOORING STATION IMPROVEMENT

Status: IN PROGRESS

Description: AFT BITTS ROLLERS FAIRLEADS MAINTENANCE

Status: IN PROGRESS

Description: VARIOUS FANS AND EXAUST FANS COSMETIC IMPROVEMENT

Status: COMPLETED

Description: VARIOUS ACC ENTRANCE - VENTS COSMETIC

Status: IN PROGRESS